Skip to main content
+44 20 7616 7575
Service Menu
  • News
  • Resources
  • Careers
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Dynamic compaction
        • Earthquake drains
        • Dynamic replacement
        • Mass mixing
        • Mixed modulus columns CMM ®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • TRD
        • Vibro compaction
        • Vibro concrete columns
        • Vibro stone columns / Vibro replacement
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compaction grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Permeation grouting
        • Injection systems
        • Polyurethane grouting
        • Rock / fissure grouting
      • Deep foundations
        • Bored piles / drilled shafts
        • CFA piles (auger cast)
        • Canopy / umbrella tubes
        • Driven cast in-situ piles
        • Driven precast piles
        • Ductile iron piles
        • Franki piles
        • Helical / screw piles
        • Macropiles
        • Micropiles
      • Earth retention
        • Anchors - single bond length
        • Contiguous pile walls
        • Diaphragm walls / barrettes – grab
        • Gabions
        • King post / soldier piles and lagging walls
        • Micropile slide stabilisation system
        • SBMA
        • Secant pile walls
        • Sheet piles
        • Shotcrete
        • Slurry cut-off walls
        • Soil nails
      • Marine
        • Bridge construction
        • Jetty construction
        • Wharf construction
        • Wharf maintenance and repair
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Heave control
        • Heavy foundations
        • Liquefaction mitigation
        • Re-levelling structures
        • Underpinning
      • Low impact, low carbon construction
        • Lower carbon solutions
        • Remediation
        • Reducing waste and materials
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation / void filling
        • Sinkhole / Karst stabilisation
        • Tunnelling
      • Marine structures
      • Seepage control
      • Slope stabilisation
      • Monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
    • Design and build
  • Projects
  • How we work
    • Code of business conduct
    • Values
    • ESG and sustainability
    • Safety
    • Diversity, equity and inclusion
    • Employment practices
    • Quality
  • About us
    • Keller Group
    • Where we operate
    • Our leadership
    • Our strategy
    • Our history
    • Corporate governance
  • Investors
    • Why invest in us?
    • Results, reports and presentations
    • Financial information
    • ESG and sustainability
    • Share price information
    • Analyst estimates
    • Regulatory news
    • Financial calendar
    • Shareholder information
    • Investor feedback
    • Investor contacts
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Our offices
    • Media contacts
    • Investor contacts
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (808)
  • News article (341)
  • Resource (266)
  • Content page (90)
  • Technique (49)
  • Project (35)
  • Solution (18)
  • Market (6)
  • Landing page (3)
Request a quote
Get assistance
Download
Keller project in Mulhouse, France
Resource
Keller project in Mulhouse, France Keller at General de Gaulle Square Mulhouse France Image Jet grouting work at General de Gaulle Square in Mulhouse, France Download
/node/5516
Download
Keller project in Melbourne, Australia
Resource
Keller project in Melbourne, Australia keller rigs working in tunnel Image Ground improvement work on Melbourne's Metro Tunnel in Australia Download
/node/5517
Download
Keller project in Mablethorpe, UK
Resource
Keller project in Mablethorpe, UK Keller retail development project in Mablethorpe UK Image Mixed modulus columns on a retail development project in Mablethorpe, United Kingdom Download
/node/5522
Download
Keller project in Szczecin, Poland
Resource
Keller project in Szczecin, Poland Keller project at Szczecin Seaport Poland Image Jet grouting on a railway site at Szczecin Seaport in Poland Download
/node/5527
Download
Keller project in Vallandry, France
Resource
Keller project in Vallandry, France Keller project in Vallandry France Image Stone columns on a gondola lift project in Vallandry, France Download
/node/5532
Download
Keller project in Tortefontaine, France
Resource
Keller project in Tortefontaine, France Keller wind farm project in Tortefontaine France Image Rigid inclusions on a wind farm project in Tortefontaine, France Download
/node/5537
Metro Tunnel Project - Cross Passage 21
Project
Metro Tunnel Project - Cross Passage 21 Keller designed and fabricated two jack-up working platforms to enable elevated access to work area whilst providing uninterrupted access for tunnel operations…
/projects/metro-tunnel-project-cross-passage-21
A465 Heads of the Valley road
Project
A465 Heads of the Valley road The A465 is a key strategic corridor connecting the M4 in South Wales to England. A study in the 1990s identified that improvement of the road was critical to the social…
/projects/a465-heads-valley-road
London Power Tunnels 2
Project
London Power Tunnels 2 LPT2 is the second phase of an ambitious project to ‘rewire London’ to future proof the capital’s electricity supplies. The project involves building 30km of cable tunnels…
/projects/london-power-tunnels-2
Maroochydore to Mons interchanges
Project
Maroochydore to Mons interchanges Construction of multiple products, across multiple sites including solutions that took into account site-specific issues around space, safety and the environment…
/projects/maroochydore-mons-interchanges
Off to a smooth start with Moretrench
News article
Off to a smooth start with Moretrench News article category Project Despite some regulatory delays, a major power plant modernisation project in Florida got off to a smooth start on site, thanks to…
/news/smooth-start-moretrench
All aboard Keller’s Geo-Train idea
News article
All aboard Keller’s Geo-Train idea News article category Project When a large-scale railway improvement project in Poland hit the buffers due to a conflict over temporary closures, Keller came up…
/news/all-aboard-kellers-geo-train-idea
Keller celebrates Global Diversity Awareness Month
News article
Keller celebrates Global Diversity Awareness Month News article category Workplace and people October is Global Diversity Awareness Month and an opportunity to celebrate and increase awareness about…
/news/keller-celebrates-global-diversity-awareness-month
Download
https://www.youtube.com/watch?v=YzbUiDJB6TM
Global Day of Parents 2021
Resource
Global Day of Parents 2021 keller engineer with her son Video Keller celebrates our colleagues and their families on Global Day of Parents Download https://www.youtube.com/watch?v=YzbUiDJB6TM
/node/5576
Download
https://www.youtube.com/watch?v=cd24z09498I
Global Diversity Awareness Month 2021
Resource
Global Diversity Awareness Month 2021 keller employees on site Video To celebrate Global Diversity Awareness Month, hear members of our Keller team share their experience on the benefits of diversity…
/node/5581
Celebrating our female Engineering Heroes
Content page
Celebrating our female Engineering Heroes For International Women in Engineering Day (23 June), we recognised the brilliant women of Keller: those who are leading from the front in our field, who are…
/celebrating-our-female-engineering-heroes
Download
https://www.youtube.com/watch?v=ub523Y_8n9o
#ChooseToChallenge
Resource
#ChooseToChallenge Keller employees doing the choose to challenge sign Video Keller employees on what they're 'choosing to challenge' for International Women's Day Download https…
/node/5591
Download
Privacy Policy - Latvian
Resource
Privacy Policy - Latvian Privacy Policy - Latvian - front cover Policy Privacy Policy - Latvian Download
/node/5601
Download
Our wellbeing foundations
Resource
Our wellbeing foundations Wellbeing brochure featuring images of Keller employees Brochure Keller's global employee wellbeing framework Download
/node/5606
Our wellbeing foundations
News article
Our wellbeing foundations News article category Workplace and people We’re proud to announce the launch of our new global wellbeing framework at Keller: ‘Our wellbeing foundations’. Wellbeing…
/news/our-wellbeing-foundations

Pagination

  • Previous page ‹‹
  • Page 29
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Group plc

Registered in England No: 02442580
Registered office: 2 Kingdom Street,
London W2 6BD

Footer links
  • Careers
  • Modern slavery and human trafficking

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Manage cookies (investor centre)
  • Sitemap
Social links
  • LinkedIn
  • YouTube