Skip to main content
+44 20 7616 7575
Service Menu
  • News
  • Resources
  • Careers
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Dynamic compaction
        • Earthquake drains
        • Dynamic replacement
        • Mass mixing
        • Mixed modulus columns CMM ®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • TRD
        • Vibro compaction
        • Vibro concrete columns
        • Vibro stone columns / Vibro replacement
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compaction grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Permeation grouting
        • Injection systems
        • Polyurethane grouting
        • Rock / fissure grouting
      • Deep foundations
        • Bored piles / drilled shafts
        • Canopy / umbrella tubes
        • CFA piles (auger cast)
        • Driven cast in-situ piles
        • Driven precast piles
        • Ductile iron piles
        • Franki piles
        • Helical / screw piles
        • Macropiles
        • Micropiles
      • Earth retention
        • Anchors - single bond length
        • Contiguous pile walls
        • Diaphragm walls / barrettes – grab
        • Gabions
        • King post / soldier piles and lagging walls
        • Micropile slide stabilisation system
        • SBMA
        • Secant pile walls
        • Sheet piles
        • Shotcrete
        • Slurry cut-off walls
        • Soil nails
      • Marine
        • Bridge construction
        • Jetty construction
        • Wharf construction
        • Wharf maintenance and repair
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Heave control
        • Heavy foundations
        • Liquefaction mitigation
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation / void filling
        • Sinkhole / Karst stabilisation
        • Tunnelling
      • Marine structures
      • Seepage control
      • Slope stabilisation
      • Remediation
      • Monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
    • Design and build
  • Projects
  • How we work
    • COVID-19 response
    • Code of business conduct
    • Values
    • Health and safety
    • Diversity, equity and inclusion
    • Quality
    • Sustainability
  • About us
    • Keller Group
    • Where we operate
    • Our leadership
    • Our strategy
    • Our history
    • Corporate governance
  • Investors
    • Why invest in us?
    • Results, reports and presentations
    • Financial information
    • Share price information
    • Analyst estimates
    • Regulatory news
    • Financial calendar
    • Shareholder information
    • Investor contacts
 Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Our offices
    • Media contacts
    • Investor contacts
    • Request a quote
    • Get assistance

Resources

Search all resourcesClear filters
Breadcrumb
  1. Home
  2. Resources
28 resources
Graeme Cook, Group HR Director, Keller Group
Image

Graeme Cook

Group Human Resources Director
Download
Jim De Waele, President Europe, Keller
Image

Jim De Waele

President, Europe
Download
Peter Wyton, President, AMEA
Image

Peter Wyton

President, Asia-Pacific, Middle East and Africa
Download
James Hind, President North America, Keller
Image

James Hind

President, North America
Download
Venu Raju, Engineering and Operations Director
Image

Venu Raju

Group Engineering and Operations Director
Download
David Burke, Keller's Chief Financial Officer
Image

David Burke

Chief Financial Officer
Download
Michael Speakman, Chief Executive Officer, Keller
Image

Michael Speakman

Chief Executive Officer
Download
graphic with company facts and figures
Infosheet

Keller at a glance

Facts and figures about Keller Group
Download
The cover to Keller's brochure that explains how it's enabling low impact, low carbon construction
Brochure

Building a better world

Enabling low-impact, low carbon construction
Download
black and white birds eye image of construction site
Brochure

Corporate brochure

By connecting global resources and local knowledge, we tackle the toughest engineering challenges, managing risk in the ground in over 40 countries around the world.
Download
blue green and yellow squares containing employee faces
Brochure

We are Keller

Keller is committed to being a diverse and inclusive place to work, reflecting the world in which we operate.
Download
collection of keller employee photos
https://youtu.be/sBdQYZfh-74
Video

In it together

We’ve been so proud of the way our Keller colleagues have dealt with the challenges that COVID-19 has brought. Here’s a snapshot of how we’ve been keeping safe and supporting one another over the last few months.
Play
  • Show more resources

Register for alerts

Read our Privacy Policy

Alert types
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2021 Copyright Keller Group plc

Registered in England No: 02442580
Registered office: 5th floor,
1 Sheldon Square, London W2 6TT

Footer links
  • Careers
  • Modern slavery and human trafficking

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube