Skip to main content
+44 20 7616 7575
Service Menu
  • News
  • Resources
  • Careers
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Dynamic compaction
        • Earthquake drains
        • Dynamic replacement
        • Mass mixing
        • Mixed modulus columns CMM ®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • TRD
        • Vibro compaction
        • Vibro concrete columns
        • Vibro stone columns / Vibro replacement
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compaction grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Permeation grouting
        • Injection systems
        • Polyurethane grouting
        • Rock / fissure grouting
      • Deep foundations
        • Bored piles / drilled shafts
        • Canopy / umbrella tubes
        • CFA piles (auger cast)
        • Driven cast in-situ piles
        • Driven precast piles
        • Ductile iron piles
        • Franki piles
        • Helical / screw piles
        • Macropiles
        • Micropiles
      • Earth retention
        • Anchors - single bond length
        • Contiguous pile walls
        • Diaphragm walls / barrettes – grab
        • Gabions
        • King post / soldier piles and lagging walls
        • Micropile slide stabilisation system
        • SBMA
        • Secant pile walls
        • Sheet piles
        • Shotcrete
        • Slurry cut-off walls
        • Soil nails
      • Marine
        • Bridge construction
        • Jetty construction
        • Wharf construction
        • Wharf maintenance and repair
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Heave control
        • Heavy foundations
        • Liquefaction mitigation
        • Re-levelling structures
        • Underpinning
      • Low impact, low carbon construction
        • Lower carbon solutions
        • Remediation
        • Reducing waste and materials
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation / void filling
        • Sinkhole / Karst stabilisation
        • Tunnelling
      • Marine structures
      • Seepage control
      • Slope stabilisation
      • Monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
    • Design and build
  • Projects
  • How we work
    • Code of business conduct
    • Values
    • ESG and sustainability
    • Safety
    • Diversity, equity and inclusion
    • Employment practices
    • Quality
  • About us
    • Keller Group
    • Where we operate
    • Our leadership
    • Our strategy
    • Our history
    • Corporate governance
  • Investors
    • Why invest in us?
    • Results, reports and presentations
    • Financial information
    • ESG and sustainability
    • Share price information
    • Analyst estimates
    • Regulatory news
    • Financial calendar
    • Shareholder information
    • Investor feedback
    • Investor contacts
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Our offices
    • Media contacts
    • Investor contacts
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (801)
  • News article (336)
  • Resource (266)
  • Content page (91)
  • Technique (49)
  • Project (35)
  • Solution (18)
  • Market (6)
Request a quote
Get assistance
Dry soil mixing
Technique

Dry soil mixing is a ground improvement technique that improves soft, high moisture clays, peats, and other weak soils, by mechanically mixing them with dry cementitious binder.

/expertise/techniques/dry-soil-mixing
Jet grouting
Technique

Jet grouting uses high velocity fluid jets to construct cemented soil of varying geometries in the ground.

/expertise/techniques/jet-grouting
Anchors - single bond length
Technique

Ground anchors transfer tensile loads and consist of an anchor head, a free length and a bond length. The free length enables the anchor to be, a big advantage for excavation pits with very low horizontal deflections.

/expertise/techniques/anchors-single-bond-length
SBMA
Technique

Single bore multiple anchor (SBMA) are ground anchors with multiple (more than one) bonds.

/expertise/techniques/sbma
Contiguous pile walls
Technique

Contiguous pile walls consist of piles arranged in a way that a gap remains between the piles. Where required the soil between the piles can be stabilised during excavation by either installing timber lagging in front of the excavated soil or by building a reinforced shotcrete wall towards the…

/expertise/techniques/contiguous-pile-walls
King post / soldier piles and lagging walls
Technique

King post/soldier piles and lagging walls are a cost effective system of temporary or permanent retaining wall using beams and pre-cast concrete panels.

/expertise/techniques/king-post-soldier-piles-and-lagging-walls
Diaphragm walls / barrettes – grab
Technique

Vertical panels are excavated under stabilising slurries using mechanical/hydraulic clamshell grabs or hydromill cutters to form a continuous cut-off, retaining and/or structural wall.

/expertise/techniques/diaphragm-walls-barrettes-grab
Slurry cut-off walls
Technique

Slurry walls are constructed using a cement-bentonite slurry to produce a below ground low permeability barrier.

/expertise/techniques/slurry-cut-off-walls
Sheet piles
Technique

Sheet piling retains soil, using steel sheets with interlocking edges and is applied using both vibratory and vibration-free installation rigs.

/expertise/techniques/sheet-piles
Gabions
Technique

Gabions are rectangular, interconnected, stone filled wire baskets formed from welded or woven mesh, used to form an aesthetic retaining wall.

/expertise/techniques/gabions
Wet soil mixing
Technique

Wet soil mixing, also known as the deep mixing method, improves the characteristics of weak soils by mechanically mixing them with cementitious binder slurry.

/expertise/techniques/wet-soil-mixing
Mass mixing
Technique

Mass Soil Mixing (MSM), or mass stabilisation, is a ground improvement technique that improves soft or loose soils, by mechanically mixing them with either wet grout or dry cementitious binder.

/expertise/techniques/mass-mixing
TRD
Technique

Trench cutting and remixing deep (TRD) soil mix walls are mixed-in-place using a specialised vertical cutter post mounted on a base crawler machine.

/expertise/techniques/trd
Soil nails
Technique

Soil nailing uses grouted, tension-resisting steel elements (nails) to reinforce in situ soils and creating a gravity retaining wall for permanent or temporary excavation support.

/expertise/techniques/soil-nails
Compensation / fracture grouting
Technique

Compensation or fracture grouting is the injection of a cement slurry grout into the soil creating and filling fractures that then lift the overlying soil and structures.

/expertise/techniques/compensation-fracture-grouting
Driven cast in-situ piles
Technique

Driven cast in-situ (DCIS) piles are constructed by driving a closed-ended hollow steel or concrete casing into the ground and then filling it with concrete.

/expertise/techniques/driven-cast-in-situ-piles
Micropile slide stabilisation system
Technique

The micropile slide stabilisation system (MS³) consists of an array of micropiles, working both in tension and compression, that connect as a system using a structurally reinforced grade beam to stop slide movements.

/expertise/techniques/micropile-slide-stabilisation-system
Canopy / umbrella tubes
Technique

Canopy/umbrella tubes (with diameters of 76-168mm) are a support system used in conventional and mechanical tunnel construction in poor soil conditions.

/expertise/techniques/canopy-umbrella-tubes
CFA piles (auger cast)
Technique

Continuous flight auger (CFA) piles are a type of bored cast-in-place replacement pile. Piles are drilled and concreted in one continuous operation enabling much faster installation time than for other piles of this type. Reinforcement is placed into the wet concrete after casting, enabling the…

/expertise/techniques/cfa-piles-auger-cast
Permeation grouting
Technique

Permeation grouting, also known as cement grouting or pressure grouting, fills cracks or voids in soil and rock and permeates coarse, granular soils with flowable particulate grouts to create a cemented mass.

/expertise/techniques/permeation-grouting
  • Show more results
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Group plc

Registered in England No: 02442580
Registered office: 2 Kingdom Street,
London W2 6BD

Footer links
  • Careers
  • Modern slavery and human trafficking

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Manage cookies (investor centre)
  • Sitemap
Social links
  • LinkedIn
  • YouTube