Skip to main content
+44 20 7616 7575
Service Menu
  • News
  • Resources
  • Careers
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Dynamic compaction
        • Earthquake drains
        • Dynamic replacement
        • Mass mixing
        • Mixed modulus columns CMM ®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • TRD
        • Vibro compaction
        • Vibro concrete columns
        • Vibro stone columns / Vibro replacement
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compaction grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Permeation grouting
        • Injection systems
        • Polyurethane grouting
        • Rock / fissure grouting
      • Deep foundations
        • Bored piles / drilled shafts
        • CFA piles (auger cast)
        • Canopy / umbrella tubes
        • Driven cast in-situ piles
        • Driven precast piles
        • Ductile iron piles
        • Franki piles
        • Helical / screw piles
        • Macropiles
        • Micropiles
      • Earth retention
        • Anchors - single bond length
        • Contiguous pile walls
        • Diaphragm walls / barrettes – grab
        • Gabions
        • King post / soldier piles and lagging walls
        • Micropile slide stabilisation system
        • SBMA
        • Secant pile walls
        • Sheet piles
        • Shotcrete
        • Slurry cut-off walls
        • Soil nails
      • Marine
        • Bridge construction
        • Jetty construction
        • Wharf construction
        • Wharf maintenance and repair
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Heave control
        • Heavy foundations
        • Liquefaction mitigation
        • Re-levelling structures
        • Underpinning
      • Low impact, low carbon construction
        • Lower carbon solutions
        • Remediation
        • Reducing waste and materials
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation / void filling
        • Sinkhole / Karst stabilisation
        • Tunnelling
      • Marine structures
      • Seepage control
      • Slope stabilisation
      • Monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
    • Design and build
  • Projects
  • How we work
    • Code of business conduct
    • Values
    • ESG and sustainability
    • Safety
    • Diversity, equity and inclusion
    • Employment practices
    • Quality
  • About us
    • Keller Group
    • Where we operate
    • Our leadership
    • Our strategy
    • Our history
    • Corporate governance
  • Investors
    • Why invest in us?
    • Results, reports and presentations
    • Financial information
    • ESG and sustainability
    • Share price information
    • Analyst estimates
    • Regulatory news
    • Financial calendar
    • Shareholder information
    • Investor feedback
    • Investor contacts
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Our offices
    • Media contacts
    • Investor contacts
    • Request a quote
    • Get assistance

Resources

Search all resourcesClear filters
Breadcrumb
  1. Home
  2. Resources
37 resources
Excavation support brochure
Brochure

Excavation support

Keller solutions for excavation support
Download
Paul Leonard, President, North America
Image

Paul Leonard

President, North America
Download
Katrina Roche, Chief Information Officer, Keller
Image

Katrina Roche

Chief Information Officer
Download
John Raine, Chief HSEQ Officer, Keller
Image

John Raine

Group HSEQ Director
Download
Peter Wyton, President, EME, Keller
Image

Peter Wyton

President, EME (Europe and Middle East)
Download
David Burke, Chief Financial Officer, Keller
Image

David Burke

Chief Financial Officer
Download
Keller at a glance infographic.
Infosheet

Keller at a glance

Facts and figures about Keller Group
Download
The cover to Keller's brochure that explains how it's enabling low impact, low carbon construction
Brochure

Building a better world

Enabling low-impact, low carbon construction
Download
keller-corporate-brochure
Brochure

Corporate brochure

By connecting global resources and local knowledge, we tackle the toughest engineering challenges, managing risk in the ground in over 40 countries around the world.
Download
blue green and yellow squares containing employee faces
Brochure

We are Keller

Keller is committed to being a diverse and inclusive place to work, reflecting the world in which we operate.
Download
collection of keller employee photos
https://youtu.be/sBdQYZfh-74
Video

In it together

We’ve been so proud of the way our Keller colleagues have dealt with the challenges that COVID-19 has brought. Here’s a snapshot of how we’ve been keeping safe and supporting one another over the last few months.
Play
keller employees in front of equipment doing a pose
https://youtu.be/6XPiXMeXS50
Video

International Women's Day 2020

Employees from across the Keller world celebrated International Women's Day on 8 March 2020. Here they are striking the #EachforEqual pose.
Play
  • Show more resources

Register for alerts

Read our privacy policy

Alert types
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Group plc

Registered in England No: 02442580
Registered office: 2 Kingdom Street,
London W2 6BD

Footer links
  • Careers
  • Modern slavery and human trafficking

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Manage cookies (investor centre)
  • Sitemap
Social links
  • LinkedIn
  • YouTube