Skip to main content
+44 20 7616 7575
Service Menu
  • News
  • Resources
  • Careers
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Dynamic compaction
        • Earthquake drains
        • Dynamic replacement
        • Mass mixing
        • Mixed modulus columns CMM ®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • TRD
        • Vibro compaction
        • Vibro concrete columns
        • Vibro stone columns / Vibro replacement
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compaction grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Permeation grouting
        • Injection systems
        • Polyurethane grouting
        • Rock / fissure grouting
      • Deep foundations
        • Bored piles / drilled shafts
        • Canopy / umbrella tubes
        • CFA piles (auger cast)
        • Driven cast in-situ piles
        • Driven precast piles
        • Ductile iron piles
        • Franki piles
        • Helical / screw piles
        • Macropiles
        • Micropiles
      • Earth retention
        • Anchors - single bond length
        • Contiguous pile walls
        • Diaphragm walls / barrettes – grab
        • Gabions
        • King post / soldier piles and lagging walls
        • Micropile slide stabilisation system
        • SBMA
        • Secant pile walls
        • Sheet piles
        • Shotcrete
        • Slurry cut-off walls
        • Soil nails
      • Marine
        • Bridge construction
        • Jetty construction
        • Wharf construction
        • Wharf maintenance and repair
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Heave control
        • Heavy foundations
        • Liquefaction mitigation
        • Re-levelling structures
        • Underpinning
      • Low impact, low carbon construction
        • Lower carbon solutions
        • Remediation
        • Reducing waste and materials
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation / void filling
        • Sinkhole / Karst stabilisation
        • Tunnelling
      • Marine structures
      • Seepage control
      • Slope stabilisation
      • Monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
    • Design and build
  • Projects
  • How we work
    • Code of business conduct
    • Values
    • ESG and sustainability
    • Safety
    • Diversity, equity and inclusion
    • Employment practices
    • Quality
  • About us
    • Keller Group
    • Where we operate
    • Our leadership
    • Our strategy
    • Our history
    • Corporate governance
  • Investors
    • Why invest in us?
    • Results, reports and presentations
    • Financial information
    • ESG and sustainability
    • Share price information
    • Analyst estimates
    • Regulatory news
    • Financial calendar
    • Shareholder information
    • Investor feedback
    • Investor contacts
Search
Menu
Close
      Contact US Dropdown Menu
      • Contact us
        • Our offices
        • Media contacts
        • Investor contacts
        • Request a quote
        • Get assistance
      • Techniques
        • Ground improvement
        • Grouting
        • Deep foundations
        • Earth retention
        • Marine
        • Instrumentation and monitoring
      • Solutions
      • Markets
      • Design and build
      • Dry soil mixing
      • Dynamic compaction
      • Earthquake drains
      • Dynamic replacement
      • Mass mixing
      • Mixed modulus columns CMM ®
      • Rapid impact compaction (RIC)
      • Rigid inclusions
      • TRD
      • Vibro compaction
      • Vibro concrete columns
      • Vibro stone columns / Vibro replacement
      • Wet soil mixing
      • Wick / PVDs / band drains
      • Cavity / bulk / mine fill grouting
      • Compaction grouting
      • Compensation / fracture grouting
      • Jet grouting
      • Permeation grouting
      • Injection systems
      • Polyurethane grouting
      • Rock / fissure grouting
      • Bored piles / drilled shafts
      • Canopy / umbrella tubes
      • CFA piles (auger cast)
      • Driven cast in-situ piles
      • Driven precast piles
      • Ductile iron piles
      • Franki piles
      • Helical / screw piles
      • Macropiles
      • Micropiles
      • Anchors - single bond length
      • Contiguous pile walls
      • Diaphragm walls / barrettes – grab
      • Gabions
      • King post / soldier piles and lagging walls
      • Micropile slide stabilisation system
      • SBMA
      • Secant pile walls
      • Sheet piles
      • Shotcrete
      • Slurry cut-off walls
      • Soil nails
      • Bridge construction
      • Jetty construction
      • Wharf construction
      • Wharf maintenance and repair
      • Instrumentation and monitoring
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Heave control
        • Heavy foundations
        • Liquefaction mitigation
        • Re-levelling structures
        • Underpinning
      • Low impact, low carbon construction
        • Lower carbon solutions
        • Remediation
        • Reducing waste and materials
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation / void filling
        • Sinkhole / Karst stabilisation
        • Tunnelling
      • Marine structures
      • Seepage control
      • Slope stabilisation
      • Monitoring
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential

      Search results

      Filter results

      • All results (804)
      • Content page (90)
      • Market (6)
      • News article (339)
      • Project (35)
      • Resource (267)
      • Solution (18)
      • Technique (49)
      Request a quote
      Get assistance

      Filter results

      • All results (804)
      • Content page (90)
      • Market (6)
      • News article (339)
      • Project (35)
      • Resource (267)
      • Solution (18)
      • Technique (49)
      Request a quote
      Get assistance
      Trading Update and Acquisition - 14 Oct 2005
      News article

      Keller Group plc (“Keller” or “the Group”), the international ground engineering specialist, is today providing a trading update for the year ending 31 December 2005 and announcing the completion of an acquisition in the US.

      /en/news/trading-update-and-acquisition-14-oct-2005
      Year End Trading Update for financial year ended 31 Dec 2005
      News article

      Keller Group plc (“Keller” or “the Group”), the international ground engineering specialist, today announces a trading update for its financial year ended 31 December 2005.

      /en/news/year-end-trading-update-financial-year-ended-31-dec-2005
      Download
      Preliminary results for the year ended 31 December 2006
      Resource
      Preliminary results for the year ended 31 December 2006
      /sites/keller-group/files/2021-01/preliminary-results-for-the-year-ended-31-december-2006.pdf
      Preliminary results for the year ended 31 December 2005
      News article

      Keller Group plc (“Keller” or “the Group”), the international ground engineering specialist, is pleased to announce its preliminary results for the year ended 31 December 2005.

      /en/news/preliminary-results-year-ended-31-december-2005
      Download
      Preliminary results for the year ended 31 December 2005
      Resource
      Preliminary results for the year ended 31 December 2005
      /sites/keller-group/files/2021-01/preliminary-results-for-the-year-ended-31-december-2005.pdf
      Acquisition of Piling Contractors
      News article

      Keller Group plc (“Keller” or “the Group”), the international ground engineering specialist, today announces that it has acquired Piling Contractors in Australia.

      /en/news/acquisition-piling-contractors
      Download
      Interim Results for the six months ended 30 June 2006
      Resource
      Interim Results for the six months ended 30 June 2006
      /sites/keller-group/files/2021-01/interim-results-for-the-six-months-ended-30-june-2006.pdf
      Interim Results for the six months ended 30 June 2006
      News article

      Keller Group plc (“Keller” or “the Group”), the international ground engineering specialist, is pleased to announce its interim results for the six months ended 30 June 2006.

      /en/news/interim-results-six-months-ended-30-june-2006
      Acquisition of Anderson Drilling
      News article

      Keller Group plc (“Keller” or “the Group”), the international ground engineering specialist, announces the completion of an acquisition in the US.

      /en/news/acquisition-anderson-drilling
      Trading Update - 17 Nov 2006
      News article

      Keller Group plc (“Keller” or “the Group”), the international ground engineering specialist, today announces a trading update for its current financial year to date.Welcome to EditPad.org - your online plain text editor. Enter or paste your text here. To download and save it, click on the button…

      /en/news/trading-update-17-nov-2006
      Year End Trading Update for financial year ended 31 Dec 2006
      News article

      Keller Group plc (“Keller” or “the Group”), the international ground engineering specialist, is providing the following routine trading update in advance of its results for the financial year ended 31 December 2006, which will be announced on 1 March 2007.

      /en/news/year-end-trading-update-financial-year-ended-31-dec-2006
      Preliminary results for the year ended 31 December 2006
      News article

      Keller Group plc (“Keller” or “the Group”), the international ground engineering specialist, is pleased to announce its preliminary results for the year ended 31 December 2006.

      /en/news/preliminary-results-year-ended-31-december-2006
      Acquisition of Systems Geotechnique
      News article

      Keller Group plc (“Keller” or “the Group”), the international ground engineering specialist, today announces the purchase of Systems Geotechnique Limited. The total consideration comprises an initial amount of approximately £7m payable in cash from Keller’s existing resources plus £1.5m of…

      /en/news/acquisition-systems-geotechnique
      AGM Statement and Half-Year Trading -Interim results
      News article

      Keller Group plc ("Keller" or "the Group"), the international ground engineering specialist, is today announcing its half-year trading update for the six months ending 30 June 2007, in advance of its Annual General Meeting, to be held at 11.00 a.m. today.

      /en/news/agm-statement-and-half-year-trading-interim-results
      Major Contract Wins in the Middle East
      News article

      Keller Group plc ("Keller" or "the Group"), the international ground engineering specialist, has recently been awarded contracts valued at around US$110m (£55m) for piling and ground improvement works in the Middle East.

      /en/news/major-contract-wins-middle-east
      Keller Board Appointment
      News article

      Keller Group plc (“Keller”), the international ground engineering specialist, is pleased to announce that it intends to appoint Mr Roy Franklin OBE as a Non-Executive Director with effect from 19 July 2007.

      /en/news/keller-board-appointment-2
      Largest-ever awards for Keller in Australia and US
      News article

      Keller Group plc ("Keller" or "the Group"), the international ground engineering specialist, announces that it has been awarded its largest-ever contract in Australia and a major project in the US:

      /en/news/largest-ever-awards-keller-australia-and-us
      Interim Results for the six months ended 30 June 2007
      News article

      Keller Group plc (“Keller” or “the Group”), the international ground engineering specialist, is pleased to announce its interim results for the six months ended 30 June 2007

      /en/news/interim-results-six-months-ended-30-june-2007
      Download
      Interim Results for the six months ended 30 June 2007
      Resource
      Interim Results for the six months ended 30 June 2007
      /sites/keller-group/files/2021-01/interim-results-for-the-six-months-ended-30-june-2007.pdf
      Update on Withdrawal from Makers
      News article

      Keller Group plc (“Keller” or “the Group”), the international ground engineering specialist, announces significant progress in the withdrawal from Makers, its UK refurbishment business.

      /en/news/update-withdrawal-makers
      • Show more results
      Footer CTAs
      • Request a quote
      • Get assistance
      • Contact us
      Home

      © 2025 Copyright Keller Group plc

      Registered in England No: 02442580
      Registered office: 2 Kingdom Street,
      London W2 6BD

      Footer links
      • Careers
      • Modern slavery and human trafficking

      Register for alerts

      Click on the button below to select the types of alerts you would like to receive

      Register for alerts
      Legal links
      • Terms of use
      • Privacy Policy
      • Manage cookies
      • Manage cookies (investor centre)
      • Sitemap
      Social links
      • LinkedIn
      • YouTube