Skip to main content
+44 20 7616 7575
Service Menu
  • News
  • Resources
  • Careers
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Dynamic compaction
        • Earthquake drains
        • Dynamic replacement
        • Mass mixing
        • Mixed modulus columns CMM ®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • TRD
        • Vibro compaction
        • Vibro concrete columns
        • Vibro stone columns / Vibro replacement
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compaction grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Permeation grouting
        • Injection systems
        • Polyurethane grouting
        • Rock / fissure grouting
      • Deep foundations
        • Bored piles / drilled shafts
        • Canopy / umbrella tubes
        • CFA piles (auger cast)
        • Driven cast in-situ piles
        • Driven precast piles
        • Ductile iron piles
        • Franki piles
        • Helical / screw piles
        • Macropiles
        • Micropiles
      • Earth retention
        • Anchors - single bond length
        • Contiguous pile walls
        • Diaphragm walls / barrettes – grab
        • Gabions
        • King post / soldier piles and lagging walls
        • Micropile slide stabilisation system
        • SBMA
        • Secant pile walls
        • Sheet piles
        • Shotcrete
        • Slurry cut-off walls
        • Soil nails
      • Marine
        • Bridge construction
        • Jetty construction
        • Wharf construction
        • Wharf maintenance and repair
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Heave control
        • Heavy foundations
        • Liquefaction mitigation
        • Re-levelling structures
        • Underpinning
      • Low impact, low carbon construction
        • Lower carbon solutions
        • Remediation
        • Reducing waste and materials
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation / void filling
        • Sinkhole / Karst stabilisation
        • Tunnelling
      • Marine structures
      • Seepage control
      • Slope stabilisation
      • Monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
    • Design and build
  • Projects
  • How we work
    • Code of business conduct
    • Values
    • ESG and sustainability
    • Safety
    • Diversity, equity and inclusion
    • Employment practices
    • Quality
  • About us
    • Keller Group
    • Where we operate
    • Our leadership
    • Our strategy
    • Our history
    • Corporate governance
  • Investors
    • Why invest in us?
    • Results, reports and presentations
    • Financial information
    • ESG and sustainability
    • Share price information
    • Analyst estimates
    • Regulatory news
    • Financial calendar
    • Shareholder information
    • Investor feedback
    • Investor contacts
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Our offices
    • Media contacts
    • Investor contacts
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (804)
  • Content page (90)
  • Market (6)
  • News article (339)
  • Project (35)
  • Resource (267)
  • Solution (18)
  • Technique (49)
Request a quote
Get assistance
Keller weathers storm to deliver in Vietnam
News article

One of Vietnam’s largest industrial manufacturers, Hoa Phat Group, is investing more than US$2 billion in a major new iron and steel processing plant in the central coastal area of Dung Quat. With the majority of works expected to be finished in just two years, the company needed to get the…

/en/news/keller-weathers-storm-deliver-vietnam
Dynamic replacement
Technique

Dynamic replacement is a variation on dynamic compaction and uses the energy of a falling weight to drive large diameter granular columns into cohesionless soils and fills.

/en/expertise/techniques/dynamic-replacement
Bridge construction
Technique

A bridge crossing a body of water creates difficult conditions for the construction of its foundations. Keller can use various techniques to meet the challenges according to the soil, environmental impact assessment, current and water depth.

/en/expertise/techniques/bridge-construction
Jetty construction
Technique

Keller has the experience and expertise to construct long jetties into deep water to allow the berthing of large vessels without the need for any dredging.

/en/expertise/techniques/jetty-construction
Wharf construction
Technique

Keller has the engineering capacity to design flexible and tailored wharf construction solutions to meet different soil conditions and requirements.

/en/expertise/techniques/wharf-construction
Wharf maintenance and repair
Technique

Demolition of quay walls can be a long and costly process, making their repair or improvement a more cost-effective solution. Keller has a wide portfolio of techniques combined with extensive experience to design a bespoke solution adapted to any situation.

/en/expertise/techniques/wharf-maintenance-and-repair
Keller bridges the gap for major DC project
News article

How do you lay foundations for buildings that will stretch over a busy interstate highway? You call the experts. As Washington DC’s largest construction project continues to take shape, we look at how Keller’s geotechnical knowhow has helped Capitol Crossing get off the ground.

/en/news/keller-bridges-gap-major-dc-project
India moves into marine sector
News article

Keller has an unmatched range of specialist geotechnical expertise that can be shared among local businesses, helping us break into new markets and offer clients a more comprehensive service. A great example of this can be found in India, where our business unit is delivering its first marine…

/en/news/india-moves-marine-sector
Accessibility
Content page
/en/accessibility
Download
Preliminary Results Announcement for the year ended 31 December 2018
Resource
Announcing results for the year ended 31 December 2018
/en/node/5391
Preliminary Results Announcement for year ended 31 Dec 2018
News article

Keller Group plc ("Keller" or "the group"), the world’s largest geotechnical specialist contractor, announces its results for the year ended 31 December 2018.

/en/news/preliminary-results-announcement-year-ended-31-dec-2018
Powering into the Bangladesh market
News article

Construction of Bangladesh's largest power plant is well underway, with Keller combining strengths from India and Malaysia to deliver the group's first ground engineering project in the country.

/en/news/powering-bangladesh-market
Victoria Embankment - Thames Tideway
Project
/en/projects/victoria-embankment-thames-tideway
Keller's innovative approach for 'super sewer'
News article

Keller has completed work on some of the deepest jet grouting ever carried out in the UK at London’s super sewer project.

/en/news/kellers-innovative-approach-super-sewer
Moretrench stabilises silo foundations
News article

Faced with sinking silos at its Vancouver, Washington site, Great Western Malting turned to foundation expert Moretrench, a Keller company since 2018, to solve a complex problem.

/en/news/moretrench-stabilises-silo-foundations
Trading update - 16 May 2019
News article

Keller Group plc ("Keller" or "the group"), the world's largest geotechnical specialist contractor, issues a trading update ahead of its Annual General Meeting to be held at 11.00am today.

/en/news/trading-update-16-may-2019
Waterway Constructions to cease operations
News article

Keller company Waterway Constructions in Australia has announced it intends to cease operations from 31 October 2019.

/en/news/waterway-constructions-cease-operations
Keller lays foundations for zinc refinery
News article

Queensland is set to benefit from a major economic boost, thanks to the expansion of a large zinc refinery in the state. Due for completion in 2021, the project is off to an excellent start, thanks to Keller successfully constructing the foundations ahead of schedule.

/en/news/keller-lays-foundations-zinc-refinery
Injection systems
Technique

Injection systems involve the injection of aqueous solutions into the ground to treat expansive, collapsible, and desiccated clay and railroad subgrade mud pockets.

/en/expertise/techniques/injection-systems
Keller to restructure in North America
News article

Keller is integrating all its foundation businesses in North America into one unified company, and rebranding to Keller, effective 1 January, 2020.

/en/news/keller-restructure-north-america
  • Show more results
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Group plc

Registered in England No: 02442580
Registered office: 2 Kingdom Street,
London W2 6BD

Footer links
  • Careers
  • Modern slavery and human trafficking

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Manage cookies (investor centre)
  • Sitemap
Social links
  • LinkedIn
  • YouTube