Skip to main content
+44 20 7616 7575
Service Menu
  • News
  • Resources
  • Careers
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Dynamic compaction
        • Earthquake drains
        • Dynamic replacement
        • Mass mixing
        • Mixed modulus columns CMM ®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • TRD
        • Vibro compaction
        • Vibro concrete columns
        • Vibro stone columns / Vibro replacement
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compaction grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Permeation grouting
        • Injection systems
        • Polyurethane grouting
        • Rock / fissure grouting
      • Deep foundations
        • Bored piles / drilled shafts
        • Canopy / umbrella tubes
        • CFA piles (auger cast)
        • Driven cast in-situ piles
        • Driven precast piles
        • Ductile iron piles
        • Franki piles
        • Helical / screw piles
        • Macropiles
        • Micropiles
      • Earth retention
        • Anchors - single bond length
        • Contiguous pile walls
        • Diaphragm walls / barrettes – grab
        • Gabions
        • King post / soldier piles and lagging walls
        • Micropile slide stabilisation system
        • SBMA
        • Secant pile walls
        • Sheet piles
        • Shotcrete
        • Slurry cut-off walls
        • Soil nails
      • Marine
        • Bridge construction
        • Jetty construction
        • Wharf construction
        • Wharf maintenance and repair
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Heave control
        • Heavy foundations
        • Liquefaction mitigation
        • Re-levelling structures
        • Underpinning
      • Low impact, low carbon construction
        • Lower carbon solutions
        • Remediation
        • Reducing waste and materials
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation / void filling
        • Sinkhole / Karst stabilisation
        • Tunnelling
      • Marine structures
      • Seepage control
      • Slope stabilisation
      • Monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
    • Design and build
  • Projects
  • How we work
    • Code of business conduct
    • Values
    • ESG and sustainability
    • Safety
    • Diversity, equity and inclusion
    • Employment practices
    • Quality
  • About us
    • Keller Group
    • Where we operate
    • Our leadership
    • Our strategy
    • Our history
    • Corporate governance
  • Investors
    • Why invest in us?
    • Results, reports and presentations
    • Financial information
    • ESG and sustainability
    • Share price information
    • Analyst estimates
    • Regulatory news
    • Financial calendar
    • Shareholder information
    • Investor feedback
    • Investor contacts
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Our offices
    • Media contacts
    • Investor contacts
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (802)
  • Content page (91)
  • Market (6)
  • News article (337)
  • Project (35)
  • Resource (266)
  • Solution (18)
  • Technique (49)
Request a quote
Get assistance
Keller sets standard on UAE rail project
News article

Keller is leading the way for ground-improvement works on the largest infrastructure project in the United Arab Emirates. A major new rail network that will create new connections among the nation’s emirates, including Dubai and Abu Dhabi, and help spur sustainable economic growth.

/news/keller-sets-standard-uae-rail-project
Download
Recruitment privacy notice - Norwegian
Resource
Recruitment privacy notice - Norwegian
/node/5311
Download
Privacy Policy - Norwegian
Resource
Privacy Policy - Norwegian
/node/5316
In the spotlight - Sophie Rex, Project Manager
News article

Project Manager Sophie Rex is from Melbourne, Australia, where she currently lives with her husband and young daughter. She worked as a geotechnical consultant for six years before joining Keller. We caught up with Sophie to discuss her varied role and the joy of being a working mum.

/news/spotlight-sophie-rex-project-manager
Investor contacts
Content page
/worldwide-contacts/investor-contacts
In the spotlight - Gabe Wasson, Apprentice
News article

Gabe is an apprentice fitter at our St Marys workshop. We had a chat with Gabe to see how he is enjoying his apprenticeship and what plans he has for his future.

/news/spotlight-gabe-wasson-apprentice
Keller develops cheaper, greener grout
News article

A new grouting material called Neutrogel® that has minimal impact on soil and groundwater, a much lower carbon footprint and lower costs, has been successfully used on a Keller project for the first time. 

/news/keller-develops-cheaper-greener-grout
Download
https://www.youtube.com/watch?v=ub523Y_8n9o
#ChooseToChallenge
Resource
Keller employees on what they're 'choosing to challenge' for International Women's Day
/node/5591
Execs sign up for reverse mentoring programme
News article

This month sees senior Keller leaders pair up with employees from across the company for a new mentoring programme with a difference: the executives are the mentees and the colleagues are the mentors. It’s all part of a drive to further strengthen our culture and help Keller become a more…

/news/execs-sign-reverse-mentoring-programme
Download
Preliminary results announcement for year ended 2020
Resource
Keller announces results for year ended 2020
/node/5431
Preliminary Results Announcement for year ended 31 Dec 2020
News article

Keller Group plc (‘Keller’ or ‘the Group’), the world’s largest geotechnical specialist contractor, announces its results for the year ended 31 December 2020.

/news/preliminary-results-announcement-year-ended-31-dec-2020
Download
Modern slavery and human trafficking statement
Resource
The steps we have and continue to take to ensure that modern slavery and human trafficking is not taking place in our business or any part of our supply chain.
/node/5436
Keller cuts project carbon emissions by more than 90%
News article

As the world’s largest geotechnical company, Keller wants to lead the sector in offering products and solutions that contribute towards a more sustainable future. One example of this is in Singapore, where Keller has worked to construct more environmentally friendly foundations for a major…

/news/keller-cuts-project-carbon-emissions-more-90
Keller completes challenging tunnel project
News article

After months of careful design planning and on-site expertise, Keller has successfully completed a unique in-tunnel grouting project for one of Melbourne’s highest profile programmes – the Metro Tunnel.

/news/keller-completes-challenging-tunnel-project
Download
Board Diversity Policy
Resource
Keller Group plc Board Diversity Policy
/node/5451
Download
Matters Reserved to the Board
Resource
Matters Reserved to the Board of Keller Group plc
/node/5456
Download
Charter of Expectations and Role Profiles
Resource
The Charter of Expectations and Role Profiles for key positions on the Keller Group plc Board
/node/5461
Download
Tax Strategy
Resource
How Keller Group manages its tax affairs
/node/5466
Kimberly takes on the sustainability challenge
News article

To mark Earth Day (22 April), we spoke to someone whose job it is to help Keller create a greener future. Kimberly Martin, Senior Engineer for Innovation and Sustainability at Keller North America, tells us about her new role, cutting carbon, increasing diversity and how a plant enzyme could…

/news/kimberly-takes-sustainability-challenge
Sustainable solution sets Keller apart
News article

Keller’s committed to reducing its impact on the environment by offering clients more sustainable solutions wherever possible. Improving weak soils with columns of compacted crushed concrete, recycled from other construction projects, is one such solution. It’s a simple, cost-effective, low-…

/news/sustainable-solution-sets-keller-apart
  • Show more results
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Group plc

Registered in England No: 02442580
Registered office: 2 Kingdom Street,
London W2 6BD

Footer links
  • Careers
  • Modern slavery and human trafficking

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Manage cookies (investor centre)
  • Sitemap
Social links
  • LinkedIn
  • YouTube