Skip to main content
+44 20 7616 7575
Service Menu
  • News
  • Resources
  • Careers
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Dry soil mixing
        • Dynamic compaction
        • Earthquake drains
        • Dynamic replacement
        • Mass mixing
        • Mixed modulus columns CMM ®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • TRD
        • Vibro compaction
        • Vibro concrete columns
        • Vibro stone columns / Vibro replacement
        • Wet soil mixing
        • Wick / PVDs / band drains
      • Grouting
        • Cavity / bulk / mine fill grouting
        • Compaction grouting
        • Compensation / fracture grouting
        • Jet grouting
        • Permeation grouting
        • Injection systems
        • Polyurethane grouting
        • Rock / fissure grouting
      • Deep foundations
        • Bored piles / drilled shafts
        • CFA piles (auger cast)
        • Canopy / umbrella tubes
        • Driven cast in-situ piles
        • Driven precast piles
        • Ductile iron piles
        • Franki piles
        • Helical / screw piles
        • Macropiles
        • Micropiles
      • Earth retention
        • Anchors - single bond length
        • Contiguous pile walls
        • Diaphragm walls / barrettes – grab
        • Gabions
        • King post / soldier piles and lagging walls
        • Micropile slide stabilisation system
        • SBMA
        • Secant pile walls
        • Sheet piles
        • Shotcrete
        • Slurry cut-off walls
        • Soil nails
      • Marine
        • Bridge construction
        • Jetty construction
        • Wharf construction
        • Wharf maintenance and repair
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Heave control
        • Heavy foundations
        • Liquefaction mitigation
        • Re-levelling structures
        • Underpinning
      • Low impact, low carbon construction
        • Lower carbon solutions
        • Remediation
        • Reducing waste and materials
      • Containment
      • Excavation support
      • Stabilisation
        • Mine stabilisation / void filling
        • Sinkhole / Karst stabilisation
        • Tunnelling
      • Marine structures
      • Seepage control
      • Slope stabilisation
      • Monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
    • Design and build
  • Projects
  • How we work
    • Code of business conduct
    • Values
    • ESG and sustainability
    • Safety
    • Diversity, equity and inclusion
    • Employment practices
    • Quality
  • About us
    • Keller Group
    • Where we operate
    • Our leadership
    • Our strategy
    • Our history
    • Corporate governance
  • Investors
    • Why invest in us?
    • Results, reports and presentations
    • Financial information
    • ESG and sustainability
    • Share price information
    • Analyst estimates
    • Regulatory news
    • Financial calendar
    • Shareholder information
    • Investor feedback
    • Investor contacts
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Our offices
    • Media contacts
    • Investor contacts
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (808)
  • News article (341)
  • Resource (266)
  • Content page (90)
  • Technique (49)
  • Project (35)
  • Solution (18)
  • Market (6)
  • Landing page (3)
Request a quote
Get assistance
Accessibility
Content page
Accessibility We recognise the importance of providing a website that is inclusive and available for all user groups. This page explains our approach to making this website accessible; the features…
/accessibility
Victoria Embankment - Thames Tideway
Project
Victoria Embankment - Thames Tideway Design and manufacture of bespoke monitoring equipment to meet challenging project criteria. Rigs working at night on Keller's Thames Tideway jet grouting…
/projects/victoria-embankment-thames-tideway
Injection systems
Technique
Injection systems Injection systems involve the injection of aqueous solutions into the ground to treat expansive, collapsible, and desiccated clay and railroad subgrade mud pockets. Injection…
/expertise/techniques/injection-systems
Manage cookies
Content page
Manage cookies This website, like most websites, stores or retrieves information on your browser in the form of cookies (as well as related technologies such as beacons, tags and scripts). This…
/manage-cookies
Worldwide contacts
Content page
Worldwide contacts Keller Group plc - Group Head Office 2 Kingdom Street London W2 6BD T: +44 (0) 20 7616 7575 E: [email protected] Africa Algeria  ( French , English ) Mauritius Mozambique Asia ASEAN…
/worldwide-contacts
Oceana Bal Harbour
Project
Oceana Bal Harbour Basement excavation for high rise residential building on Miami Beach, Florida. beach-front site between high rise buildings The project A 28-story residential high-rise planned…
/projects/oceana-bal-harbour
Zayed City
Project
Zayed City Ground improvement project on 4,500 hectare urban development. single keller rig in action on remote site The project Zayed City is part of Plan Abu Dhabi 2030, one of the UAE’s most…
/projects/zayed-city
Chevron Wheatstone project
Project
Chevron Wheatstone project Major project to install more than 25,000 piles in the Pilbara. keller rigs and steel piles in remote area The project In late 2011, Chevron Australia began construction of…
/projects/chevron-wheatstone-project
Aragon Development Complex
Project
Aragon Development Complex Keller's first cutter soil mixing project in Canada on a mid-rise development complex. cutter soil mixing equipment close up in action The project Aragon Properties…
/projects/aragon-development-complex
Download
https://youtu.be/-mIMbgc5aZ8
Introduction to Keller
Resource
Introduction to Keller keller employees in a group putting their hands together on site Video Every day, people around the world live, work and play on ground prepared by Keller. Used alone or in…
/node/2716
Download
https://youtu.be/6XPiXMeXS50
International Women's Day 2020
Resource
International Women's Day 2020 keller employees in front of equipment doing a pose Video Employees from across the Keller world celebrated International Women's Day on 8 March 2020. Here…
/node/2726
Download
https://youtu.be/sBdQYZfh-74
In it together
Resource
In it together collection of keller employee photos Video We’ve been so proud of the way our Keller colleagues have dealt with the challenges that COVID-19 has brought. Here’s a snapshot of how we’ve…
/node/2731
East Port Said Development
Project
East Port Said Development Pre-fabricated vertical drains for major Egypt transshipment hub. water pools on large site are in Egypt The project With its new container terminals almost doubling the…
/projects/east-port-said-development
DC Clean Rivers Project
Project
DC Clean Rivers Project Diaphragm wall shafts for tunnel and sewer network two large tunnels and yellow rig on waterside construction site The project The DC Clean Rivers Project Division A - Blue…
/projects/dc-clean-rivers-project
Dormac Dock Quay
Project
Dormac Dock Quay Quay wall construction for floating dock in Kwa-Zulu storage facilities and cranes next to docs and water The project A new facility for a floating dock with 12.5m CD water depth…
/projects/dormac-dock-quay
Hard Rock Casino tunnel
Project
Hard Rock Casino tunnel Tunnel construction for iconic Florida hotel expansion cranes and construction site next water and greenery The project The $1.8 billion expansion of The Seminole Tribe of…
/projects/hard-rock-casino-tunnel
Lake Travis Raw Water Intake Tunnel
Project
Lake Travis Raw Water Intake Tunnel Drilled shaft completion for new Texas water treatment plant red rig working on the water The project A 30 foot by 30 foot raw water intake tunnel was planned for…
/projects/lake-travis-raw-water-intake-tunnel
Maritime Link transmission line
Project
Maritime Link transmission line Ground anchor installation for transmission towers in Newfoundland keller rig in action in the snow The project Emera hired Rokstad Power to erect a transmission line…
/projects/maritime-link-transmission-line
Olin Chlor Alkali chemical plant
Project
Olin Chlor Alkali chemical plant Installing foundations for high voltage electric pole and lines two workers on site wearing ppe The project A recent expansion at the Olin Chlor Alkali Chemical Plant…
/projects/olin-chlor-alkali-chemical-plant
Port Miami Terminal B
Project
Port Miami Terminal B Auger cast pile foundations for new cruise line terminal large glass cruise terminal building on water edge The project Several new terminals for PortMiami are being constructed…
/projects/port-miami-terminal-b

Pagination

  • Previous page ‹‹
  • Page 4
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Group plc

Registered in England No: 02442580
Registered office: 2 Kingdom Street,
London W2 6BD

Footer links
  • Careers
  • Modern slavery and human trafficking

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Manage cookies (investor centre)
  • Sitemap
Social links
  • LinkedIn
  • YouTube